Harvard Infrastructure Project Santa Paula, CA

Phoenix designed the Harvard Blvd. Water and Sewer Replacement Project, and is currently managing and inspecting the construction of this project.  This project involves the design of ~8600 linear feet of 12-inch diameter potable water pipeline and ~8100 linear feet of 24-inch diameter wastewater pipeline.  Utility coordination, all associated infrastructure design and ~700,000 square feet of pavement has been designed and coordinated by Phoenix.

STA 1+00 north view of overall site_20230216_135800.jpg

A NEW APPROACH TO INFRASTRUCTURE

SUMMARY

Phoenix designed the infrastructure project in 2021.  Construction began in 2022  and is scheduled to be complete in 2024.

LOCATION

Santa Paula, CA

YEAR

2021-2024

CLIENT

City of Santa Paula, CA

harvard 2023.jpg